Photos supplied, with permission, by Renee Willis, Diamond W Barrel Horses, of Princeton, BC
Latest Installation
This is a 40x 80 building with a 1:12 SSR roof and a 1-foot eave overhang, You can see the door openings in preparation for doors to be hung.
The foundation consisted of an engineered screw pile component along with a 12″ by 12″ concrete grade beam which housed the anchor bolts and rebar (for tie-in to slab). It took 5 days to complete the foundation work and another 5 to erect as seen here.
Hats off to our crews and foundation, structural and Geotech engineers!